© Carl F McDaniel




Blue arrows indicate the approx. transition point for the concrete barrier.....
The large concrete block will hold up a steel overhead truss that will hold signs
over the south bound lanes ( in picture above )....The truss should go clear over
to the wall on the east side of the north bound lanes...
The steel truss over the north bound lanes could hold two signs......
One on the left would indicate a left turn onto W.Church St....the
one on the right would indicate Mkt Sq.....
E-mail received indicates that people think this is poor design.......
One even said "take money from the stupid observation decks
and use it to buy a longer steel truss" balance things out...
More poor design are those bridge lights.......a manager of one of the
city banks told me that they blind him when he crosses at night....all
they need are lights like the ones on the "A" approach ramp....


Friday morning May 11, 2007 they are putting the top steel form
on to Pier # 3 S.Side.......

Ready to put in the re-bar assembly and pour the concrete....

This is the ramp for south bound and north bound traffic.....a concrete
divider will be placed over the gravel shown in this picture.......May 11, 2007
(date on photo not correct)

This is Friday afternoon May 11, 2007.......the guys in the white hats are bosses.
the rest are workers....

There are two monsters involved this afternoon.........


One thing is certain......the guy that owns this rig is not on welfare....