They already have DECKPANS on ramp "C".....June 25, 2007...
Taken from the Blimp Camera....

Deckpans on ramp "C" taken from the bridge....

July 10, 2007 Laying rebars on " C " ramp....taken from the blimp camera,



The indentation in the plywood will be the spot where an overhead
light standard goes.....

Looking west down the north bikeway ramp....

From the dike.....looking west at the MSE ramp "D"......looks like cars
are coming down the ramp....(check your eyes)

These are the signs that are going up on an overhead steel truss
right across from Starbucks on the west bound lanes....There will
be one more sign on the left (Lock Haven.....Mansfield) not seen
in this photo. ...I believe the large sign will be covered up until the
bridge is open...

This photo was taken June 27, 2007 a day after the above photo.
The sign to the right is covered and the sign to the left is added.

Photo shows the heavy steel tubing that will hold the signs...

This is Thursday June 28, 2007.....the signs are over west bound
I-180..........Just west of the Basin Street underpass..

Friday morning June 29, 2007.........these signs are just east of the
Hepburn Street underpass on I-180..

These two signs will be on a steel overhead truss over the north
bound lanes leading up to the bridge on S.Side as indicated by
the RED ARROWS.......

This is the vertical support for the overhead steel truss indicated by
the red arrows in the above picture....

Look how sturdy this thing is built...........