A.....beam D 4
B.....beam D 13
C.....expansion joint
D.....platform to hold concrete overhang
E.....deckpans
F.....foam to keep concrete from falling through holes
N.....Nelson Bolts

These are deckpans and Nelson Bolts on ramp "D" down ramp
to I-180 east....

A.....beam " D 4 "
B.....beam " D 13 "
C.....wooden platform for overhang
D.....deck pans
N.....Nelson Bolts\
Arrows show the bolts that hold up the platform



This is the expansion joint between the ramp steel and the concrete abutment
for the MSE ramp "D"...

They just poured concrete in the plywood form for the curtin wall.....The beams are the BOX BEAMS over the
new E. Second Ave.

This photo shows a finished curtin wall.....

The concrete beam is a BOX BEAM over E.Second Ave or the railroad
tracks.....

The new bridge ramp approach......two lanes to the left and one lane to
the right for trucks going down to E.Second Ave past Clarkson Chemical Co.

BOX BEAMS sitting on the MSE on S.Side......The vertical pipe
holds the safety cable for the workers.......I believe the plywood form is for a diaphram....

This air view I took shows the offices for J.P. Dick & Trumbull & for Penn Dot....
I have dozens more air views......

Blame it on Clinton.........