Wed. morning August 22, 2007......the steel overhead truss with the
signs is already up w/signs covered over the southbound lanes...
no rain....


Looking north up the ramp to the bridge on S.Side. The overhead
steel truss for the direction signs is already up......no rain

Taken from the blimp camera.....the south bound lanes are from
the galvanized pole at the left to the pole to the right.......

From the blimp camera looking east....

Taken from the blimp camera...Aug 22, 2007 morning....
NOTICE only two signs up....


Thursday August 23rd......three signs up........if you miss it today,
its too late tomorrow......its history......

Looking towards ramp "C" up ramp.....

This is the track that the concrete machine runs on.....dates wrong....

The very south end of the bridge....dates wrong....

Looking north at the back of the overhead steel truss over the south bound
lanes coming from Mkt Sq.....

Looking west at the new ramp "B" MSE.......
CLICK HERE TO GO TO THE NEXT PAGE
|