HOME | 1 | 226 | 227 | 228 | 229 | 230 | 231 | 232 | 233 | 234 | 235 | 236 | 237 | 238 | 239 | 240 | 241 | 242 | 243 | 244 | 245 | 246 | 247 | 248 | 249 | 250 | 251 | 252 | 253 | 254 | 255 | 256 | 257 | 258 | 260 | 259 | 262 | 263 | 264 | 265 | 266 | 267 | 268 | 269 | 270 | 271 | 272 | 273 | 274 | 275 | 276 | 277 | 278 | 279 | 280 | 281 | 282 | 283 | 284 | 285 | 286 | 287 | 288 | 289 | 290 | 291 | 292 | 293 | 294 | 295 | 296 | 297 | 298 | 299 | 300 | 301 | 302 | 303 | 66 | 67 | 68 | 69 | 70 | 71 | 72 | 73 | 74 | 75 | 76 | 77 | 78 | 79 | 80 | 81 | 82 | 83 | 84 | 85 | 86 | 87 | 93 | 94 | 95 | 96 | 97 | 98 | 99 | 100 | 101 | 102 | 104 | 106 | 107 | 108 | 110 | 111 | 112 | 113 | 114 | 115 | 116 | 117 | 118 | 119 | 120 | 121 | 122 | 126 | 127 | 123 | 124 | 125 | 128 | 129 | 130 | 131 | 132 | 133 | 134 | 135 | 136 | 137 | 138 | 139 | 140 | 141 | 142 | 143 | 144 | 145 | 145A | 146 | 146A | 147 | 148 | 149 | 150 | 151 | 152 | 153 | 154 | 155 | 156 | 157 | 158 | 159 | 160 | 161 | 162 | 164 | 165 | 166 | 167 | 168 | 169 | 170 | 171 | 172 | 173 | 174 | 175 | 176 | 177 | 178 | 179 | 180 | 181 | 182 | 183 | 184 | 185 | 186 | 187 | 188 | 189 | 190 | 191 | 192 | 193 | 194 | 195 | 196 | 197 | 198 | 200 | 201 | 202 | 203 | 204 | 205 | 206 | 207 | 208 | 209 | 210 | 211 | 212 | 213 | 214 | 215 | 216 | 217 | 218 | 219 | 220 | 221 | 222 | 223 | 224 | 225 | .... | 163 | 109 | 105 | 103 | 88 | 89 | 90 | 91 | 92 | 62 | 63 | 60 | 61 | 56 | 57 | 58 | 59 | 55 | 53 | 54 | 50 | 51 | 52 | 46 | 47 | 48 | 49 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 26 | 27 | 28 | 25 | 21 | 22 | 23 | 24 | 20 | 19 | 14 | 15 | 16 | 17 | 18 | 5 | 3 | 12 | 13 | 11 | 8 | 10 | 6 | 7 | 9 | 4 | 2

WILLIAMSPORT'S MARKET STREET BRIDGE

P 278

Received an e-mail from a lady that said I do not take any exciting pictures
anymore.......the bridge is at a point where there aren't many pictures to take.
Everything I take is part of the bridge project........

sept10072.jpg

Monday morning on ramp "B"..Sept 10,  2007..........The black paper is a layer separation
between two different types of material; #57 stone and 2A subase....

sept11072.jpg

At the left you can see the top of Pier #7 where the overhead steel truss
for the signs will be fastened......The red piece of equipment (pictured below)
is a Cantilever Stripping Buggy that allows workers to work safely along the
edge of the bridge.
 

astrippingbuggy.jpg

A Cantilever Stripping Buggy......

xlate4.jpg

Notice the conduits for the bridge lights inside the wall....

sept11074.jpg

A worker making a cut in the blacktop to make the edge square and straight
at the south end of the bridge and the up ramp.

#####################################################################

Just received the following pictures from the printers.  Will put on
the proper pages when time permits..,...this is the reason I am
always broke.....no help from anybody.....

late1.jpg

This is D D..........the best machine operator on the bridge.....
Operating the Bidwell concrete machine.........

late2.jpg

These people know how to work concrete.....no amateurs here........

xlate3.jpg

This is an UP ramp......left to S.Side......right to Mkt. Sq.....

xlate5.jpg

This is not a north bound lane..........Its a left turn lane and a south bound
lane.......the concrete was poured Tue night Sept 11,  2007...

xlate6.jpg

I stopped by to tell these guys what to do next.........All are members of
G.G.S.

xlate7.jpg

From Pier #7 to the SPUI, the bridge is four lanes wide....Left lane turn left
on ramp"B" to I-180 west and Rt 15 north......right lane turn right on ramp "D"
to I-180 east and Rt. 220 north........two center lanes north to Mkt Sq.

xlate8.jpg

This is Wed morning, Sept 12,  2007 on ramp "B".......getting the first
coat of blacktop. (I can't keep up)

sept14072.jpg

Okay......this is Thurs morning....

CLICK HERE TO GO TO THE NEXT PAGE....