Workers on the stripping buggy installing drain pipes under the bridge..

Looking at ramp "C" from the blimp camera....

Worker cutting rebars to make room for the base of the railing vertical support.
This is the north bikeway ramp.....

Looking west on ramp "B" ......Notice the large pre-cast concrete pieces
they have along the top edges with rebars coming out the bottoms...Also
the steel forms to hold the concrete in place.......
This is the ramp that the large 18 wheelers will use to go north on Rt 15...

This photo shows the steel overhead truss setting on the end of Pier #7...

Looking down on the end of Pier #7.....all the bolts lined up okay....

You get in the left hand lane to go to Rt 15 north or I-180 west....

The bridge at this point is two lanes wide......after you go under the signs.......
the bridge is four lanes wide....(looking north) 9-29-07

This is the new ramp coming down from Hastings Street to E. Second Ave.
The tank truck drivers will really like this...

This is how the north bound lanes looked on Oct 1, 2007.......theres room
for everybody.....its four lanes wide at this spot.....

Everything to the left of the concrete divider is south bound lanes...
everything to the right of the divider is north bound......

Looking west up ramp "C" at the signal standards and lights.