These birds ask me to take their picture....L-R...Steve, Charley, & Mike.
Amy was there somewheres .....Working on the MSE, north & south
ramps on S.Side. Preparing for a rock face.

See the red arrows? Theres a sign back of the (RT 220) sign that tells you
NOT TO WALK.....You cannot see it from where I was standing. You can see
the sign that tells you YOU CAN WALK. I would tell Penn Dot but the last time
I told them about the bolts missing on the railings.....they told me "Its none of my
$%$#%^^ business "....

Check the yellow arrows.....it shows the little man that tells you
its okay to walk...

Looking east up ramp "A"....Things are looking good.

They are painting under the bridge...hence the tarp...

For What Its Worth.....I found out one thing today.....The steel truss over
north bound lanes is not setting on the Number 7 Pier (North Bound) as
I prevously thought..The left leg is on the south bound pier.

A lot of concrete used here .....Nov 13, 2007

This is the north bound approach to the bridge on S.Side...

Looking north east from ramp "A" to ramp "B"...Notice the clean sweeping
lines and the brown paint on the steel beams.....I-180 below...

Looking east up ramp "A".........

This machine pounds the galvanized posts into the ground..(S.Side approach
ramp...north bound)

This guardrail will be replaced about 30 times before the next bridge is built
in 2067.....think of the money to be saved if they would use pre-cast concrete
barrier blocks...
CLICK HERE TO GO TO THE NEXT PAGE....300
|