This photo shows the abutment for the west bound off ramp......this ramp
will be completed in 2008.....


This is the ramp that you will use coming from Market Square and
turn right to go west on I-180 or coming from S. Side, turn left to go
west on I-180.....

Just 180 degrees.........this is where the ramp will be....it will take
in two lanes of Via Bella.........Via Bella will be only two lanes wide
with no traffic signals......but will have ROUNDABOUTS......

On March 7th.....this crane was on a bank next to I-180 at the Basin
Street overpass.......how did they get it into this position in just a half
day.......you can see the date on the photo........

March 7, 2006

"I" beams driven into the ground to hold up the bank next to one of the
Basin Street pump station buildings.......the new traffic lane
will be just
on the other side to merge with I-180 east.....

PPL activity on the bridge from the dike.......

Installing a light standard with a crane. From the street....

The pile driver from a mile away......

Tele-photo from the dike..........pile driver next to Ceda-Cog tracks.

Two steelworkers .........tele-photo from the walkway........
CLICK HERE TO GO TO THE NEXT PAGE.....
|